Da/Pro Team Solves Critical Molding Parameters for Medical Devices

Challenge

Our customer contacted Da/Pro during the R&D phase of this project. Their engineers were designing a part that would be used in an IV system. It was critical that the seal not fail. This was a part that was very difficult to mold.

Solution

Da/Pro engineers worked with our customer to resolve both design and material issues. The project went through several design changes. The customer was on a strict time-line and had to coordinate with several part suppliers for the full assembly.

Da/Pro Engineering, Production, Customer Service and Quality Teams worked together to produce a part that passed strict FDA testing, and met the rigorous timeline required.